From port of entry to data hall floor, OVO moves the high value compute, power, and cooling systems that power the AI economy.
OVO ensures chain-of-custody integrity across secure, climate-controlled, and project-staged environments. We orchestrate the full inbound journey end-to-end: customs clearance, drayage, white-glove handling, and rack-and-stack coordination, compressing deployment timelines so every megawatt reaches revenue faster.
Logistics is now a direct lever on capital deployment
cdcfec
Every hour a hyperscale rack sits idle is lost capacity, deferred revenue, and compounding pressure on capital timelines. OVO Logistics moves the equipment that powers the digital economy: high-value compute, storage, networking, power distribution, and thermal management systems for hyperscalers, colocation operators, and enterprise builders.
From port of entry to data hall floor, OVO orchestrates the full inbound journey. Customs clearance, drayage, climate-controlled staging, white-glove inside delivery, and rack-and-stack coordination, all under one accountable platform with chain-of-custody integrity from container to cabinet.
The result is faster time to revenue for every megawatt deployed, margin protection on multi-million-dollar GPU shipments, and a logistics partner engineered for the operational rigor your investors and regulators demand.
Industry Stats
- $1T+ forecast U.S. data center capex through 2030
- 62 GW pipeline capacity under construction or contracted
- 18-month average GPU lead-time exposure on hyperscale builds
- 99.9% chain-of-custody integrity required for facility certification
Precision logistics for mission critical infrastructure.
Hyperscale buildouts move only as fast as the slowest container. OVO compresses the inbound critical path with a vertically integrated operating model: port services, climate controlled warehousing, dedicated transportation, and project execution, all under one accountable platform.
Capabilities
Phased deliveries sequenced to construction milestones, full visibility PO to commissioning.
Vibration-controlled, ESD-compliant transport for servers, GPUs, and storage arrays.
Generators, switchgear, UPS, and cooling skids, with permitting and rigging coordination
Secure, environmentally controlled staging that absorbs schedule volatility.
Ocean and air origin services from Asia and EMEA, with duty optimization and bonded movement.
Final-mile to the data hall floor, coordinated with on-site MEP and IT trades.
Secure decommission and asset recovery, sanitized to NIST 800-88 with audit-grade records.
Real-time serialized tracking through Infor WMS and OVO INTEL.
Engineered for the operators building tomorrow’s compute.
Customer Profile
Phased equipment ingest, staging, and inside delivery aligned to commissioning milestones.
Capacity expansion for AI-first tenants, integrated with your construction managers, GCs, and MEP partners.
Velocity for concentrated, high-value GPU flows, with no compromise on chain of custody.
Secure handling, ITAR-aware processes, and compliant disposition for sensitive infrastructure.
Domestic staging, kitting, and final-mile fulfillment to your end customer sites.
A logistics partner who speaks EBITDA, ROIC, and time-to-cash across your infrastructure platforms.
How OVO Solves It
How OVO delivers every phase of deployment.
Port & International
Inbound compute, power and cooling
- Customs clearance for inbound equipment
- Drayage and transloading at the port
- Expedited air for critical components
Managed Transportation
Delivery to site
- Air-ride and white-glove delivery
- Oversize transport for generators and switchgear
- Scheduled, phased deliveries
Warehousing & Fulfillment
Staging and reverse flows
- Climate-controlled staging and buffer storage
- Kitting and rack integration support
- Reverse logistics and ITAD
Supply Chain Advisory
Deployment planning
- Deployment logistics planning
- Staging network design
- Supplier and lead time risk analysis
OVO Intelligence in Data Center
Know which deliveries put go-live at risk.
Deployment Risk Scoring
Every inbound shipment scored against the energization and go-live schedule.
Lead Time Forecasting
Predicts supplier and transit delays for long lead power and cooling gear.
Serialized Visibility
Chain of custody for every asset, from factory to data hall.
FAQ
Questions Data Center leaders ask.
Do you handle power and cooling equipment as well as IT?
Yes. We move generators, switchgear, UPS and cooling systems alongside servers and network gear, on one integrated schedule.
Can you stage equipment before the site is ready?
Yes. Climate-controlled staging and buffer storage hold equipment securely until each phase of the site is ready to receive it.
Is every asset tracked by serial number?
Yes. Serialized tracking gives a full chain of custody from origin to the data hall floor.